Up
gradation
1.
Why Upgrade?
2.
Version
3.
People
Involved
4.
Stages
5.
Observations.
Why upgrade?
Oracle has decided to
stop the support in future for 11i versions.
Version
• Present version is 11.5.10.2
• Initial upgrade to 12.1.1
• Final upgrade 12.1.3
People Involved
• DBA: Upgrading the database, application and
applying Patches.
• Functional: Setups, Training and Change in Process.
• Technical: Object validations, functionality of
reports, forms, alerts and workflow.
Stages
3 phases
1. Iteration 1
a. Pre upgrade
b. Upgrade
c. Post upgrade
2. Iteration 2
a. Pre upgrade
b. Upgrade
c. Post upgrade
3. Iteration 3
a. Pre upgrade
b. Upgrade
c. Post upgrade
Pre Upgrade
• Need to meet system requirements.
• Make sure all application versions are synchronized
to present version of 11.5.10.2
• To upgrade to 12.1.3 we need to upgrade it to
12.1.1.
• DBA team will apply patches according to Oracle
document.
• Technical team will be responsible in clearing the
interfaces and make sure no data is found in interface tables.
Upgrade
• DBA team will apply patches.
• Initially 11.5.10.2 is upgraded to 12.1.1
• Functional team will check few cycles and setups.
• 12.1.1 will be upgraded to 12.1.3
Post upgrade
• Check every custom objects are moved properly.
• Object validations through compliance for invalid
table names, reports validation, value sets, alerts and workflow.
• Conference Room Pilot -1 (CRP-1), in which
functional team will start validating.
• We also provided training to users by functional
team.
• Issue with standard report of objects will be solved
by raising an SR (Service Request).
Post Upgrade Activities
|
Testing
|
Table changes
New R12 tables
Old 11i Tables
• AP_SUPPLIERS PO_VENDORS
• AP_SUPPLIER_SITES_ALL PO_VENDOR_SITES_ALL
• CE_BANK_ACCOUNTS AP_BANK_ACCOUNTS_ALL
• CE_BANK_ACCT_USES_ALL AP_BANK_ACCOUNT_USES_ALL
• XLA_EVENTS AP_ACOCUNTING_EVENTS_ALL
• XLA_AE_HEADERS AP_AE_HEADERS_ALL
• XLA_AE_LINES AP_AE_LINES_ALL
Iteration 2 and 3
• Iteration 2 will follow the same procedure as in
iteration 1.
• Setups and issues handled in iteration 1 will be
observed.
• Iteration 2 will have User Acceptance Test (UAT),
the same setups will be carried forward to production
• Iteration 3 is to reduce the down time.
Observations
• Data match with previous version.
• Path of reports uploaded is same as the application
is picking from while running from front end.
• Custom fonts are also moved.
• Fresh clone should be used for initial technical
backups or changes.
No comments: